WP7: Case Study Patents

Anonymous

Multilingual Online Translation

Task List

The work package is split into 9 major tasks as follows:

  • Task 7.1 User Requirements and Scenarios (Task Lead: UPC)
  • Task 7.2 Patent corpora (Task Lead: UPC)
  • Task 7.3 Grammars for the patent domain (Task Lead: UGOT)
  • Task 7.4 Ontologies and document indexation (Task Lead: Ontotext)
  • Task 7.5 Prototype (Task Lead: Ontotext)
  • Task 7.6 SMT and Hybrid MT (Task Lead: UPC)
  • Task 7.7 Prototype (user interface) (Tas Lead by Ontotext)
  • Task 7.8 Human evaluation (Task Lead: TBD)
  • Task 7.9 Patent Case Study: Final Report (Task Lead: UPC)


Month 10-15 plan

  • Task 7.2 starts in M10 and is due to provide a first set of corpora at the end of M16. Final revision depends on the availability of the EPO data.
  • Task 7.3 starts in M10 and is due to provide a preliminary report at the end of M16.

Month 16-21 plan

  • Task 7.1 starts at M15 and is due to provide a preliminar version at the beginning of M17.
  • Task 7.3 will produce a more complete report by the beginning of M19.
  • Task 7.4 starts at M16 and is due to provide a description of the type of queries at the end of M16.
  • Task 7.5 starts at M16 and is due to provide a description of the Prototype architecture at the end of M16.
  • Task 7.6 starts along with WP5 and will produce a SMT baseline for the Patents prototype.
  • D7.1 deadline is M21.