D9.1 MOLTO test criteria, methods and schedule


Contract No.: FP7-ICT-247914
Project full title: MOLTO - Multilingual Online Translation
Deliverable: D9.1. MOLTO test criteria, methods and schedule
Security (distribution level): Confidential
Contractual date of delivery: M7
Actual date of delivery: October 2010
Type: Report
Status & version: Draft (evolving document)
Author(s): L. Carlson et al.
Task responsible: UHEL
Other contributors:



Abstract

The present paper is the summary of deliverable D 9.1 as of M6. Workpackage materials can be found at the UHEL MOLTO website (https://kitwiki.csc.fi/twiki/bin/view/MOLTO/WebHome). This document also links to the MOLTO official website (http://www.molto-project.eu/).

(The official MOLTO website is the prime place for coordinating the project as (long as) material on it is uncluttered, reliable and up to date. For local work, informal project communication and creative planning, the UHEL MOLTO website is open to all MOLTO partners.)

This paper is structured into an introduction followed by sections per workpackage, The WPs are divided into the front end WPs (WP3 and use cases) and the back end ones (WPs 2,4,5). For each WP we survey promises from DoW, ongoing work, and derive requirements from them, followed by evaluation plans or recommendations. Text in brackets refer to source. Action points are in boldface.

The wealth of cited content aims to bring different strains of documented work planned or in progress together, in order to get an updated view of the ongoing MOLTO process, and thus cover the bases for making the tool and user WP requirements meet. We take as base what the technology offers and scale user expectations from that.

</br/></p/>