1. Introduction
We go over the later WP9 tasks first:
- performing evaluation: individual partners as contributors to WP9 perform WP-wise evaluation subject to criteria collected in this document. The WP10 leader collects the contributions to be included for the periodic reports as required. ???
- bug fixing and consolidation: The WP leader and/or the coordinator will maintain bug tracking tools and distribute bug reports or feature requests to the appropriate partner(s).
D 9.1 is to define the requirements for both the generic tools and the case studies in a coherent way that can lead to maximal synergy between work packages. To do this need to detail the project plan and schedule. This then implies the main outline of the evaluation schedule.