strict warning: Only variables should be passed by reference in /home/local/www/molto-project.eu/modules/book/book.module on line 559.

     

3. Deliverables and milestones tables

Deliverables of MOLTO are listed and linked for download on the web page http://www.molto-project.eu/workplan/deliverables.

Below is a summary of deliverables due in the third semester.

The only milestone due for the period is MS3, the web-based translation tool, which has been interpreted as a online editor interface to a GF application grammar and made available at http://www.molto-project.eu/node/1063.

ID Due date Dissemination level Nature Publication
D2.1 GF Grammar Compiler API 1 March, 2011 Public Prototype D2.1 GF Grammar Compiler API
D1.3 Periodic management report 2 1 April, 2011 Consortium Report D1.3A Advisory Board Report
D4.2 Data Models, Alignment Methodology, Tools and Documentation 1 May, 2011 Public Regular Publication D4.2. Data models and alignments
D2.2 Grammar IDE 1 September, 2011 Public Prototype D2.2 Grammar IDE
D3.1 MOLTO translation tools API 1 September, 2011 Public Prototype D 3.1. The Translation Tools API
D4.3 Grammar-Ontology Interoperability 1 September, 2011 Public Prototype D4.3 Grammar ontology interoperability
D5.1 Description of the final collection of corpora 1 September, 2011 Public Regular Publication D5.1. Description of the final collection of corpora
D6.1 Simple drill grammar library 1 September, 2011 Public Prototype Simple drill grammar library
D8.1 Ontology and corpus study of the cultural heritage domain 1 September, 2011 Public Other Ontology and corpus study of the cultural heritage domain
D1.4 Periodic management report 3 1 October, 2011 Consortium Report D1.4 Periodic Management Report T18