WP12 Interactive knowledge-based systems - M3

Summary of progress

The first 2 months we started with the Adoption phase as described in the DoW for WP12. We've focused our efforts on the requirements for the verbalization component(D12.1). We distinguish 4 categories of relevant requirements.

  • Ontology verbalization
  • Sentence Variants generation
  • Adopt of GF in Be Informed modelling process
  • Adopt GF in interactive applications for integration generated text

We presented a requirements draft to our partners in March 2012.

At the kickoff hosted by UGOT we did a first round with the UGOT people to draw up the specification to migrate Be Informed current explanation prototype to GF.

Next Steps

  • Finalize requirements for D12.1
  • Migrate current explanation engine to GF
  • Train Be Informed co workers in GF
  • Start development of business domain related abstract grammars.

Highlights

  • Kickoff MOLTO-EEU
  • Started requirements for verbalization component. Draft Outline shared with Partners M3.
  • Started a joint paper with Monnet and MOLTO partners. The article focuses on the GF (MOLTO) and lemon(MonnetO integration in ontology lexicalization and verbalization.

Use of resources

Node Professor/Manager PostDoc PhD Student Research Engineer/Intern
UGOT 0 0 0 0
BI 0,25 (J. van Grondelle, J. van Aart ) 0 0 0,25 (H. ter Horst)

Deviations from Annex I

WP12 runs longer than is indicated in the Gantt chart appearing in the Annex, however duration is correctly listed under 3.3.3. We planned for a duration of 15 months, D12.2 for instance is projected for March 2013.